Gold Member Since 2015
Audited Supplier
Shandong Weizheng Metal Structure Co., Ltd.

Parking Structure, Car Wash, Hydraulic Machine manufacturer / supplier in China, offering Prefab Light Steel Car Parking Structure (WZG60), Wz-A001prefab Large Span Steel Structure for Warehouse, Steel Bridge and so on.

(/ )

Supplier Homepage Product Light Steel Villa Prefab Light Steel Car Parking Structure (WZG60)

Prefab Light Steel Car Parking Structure (WZG60)

FOB Price: Get Latest Price
Min. Order: 1 Piece
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: WZG60)
  • Working Mode: Car Ride
  • The Vehicle Inlet and Outlet: Up
  • Certification: ISO
  • Voltage: DC 12V
  • Type: Parking Lift
  • Driving: Hydraulic
  • Design: Single Post
  • Lift Mode: Screw
Product Description

Basic Info.

Model NO.:HYG060
Material:Steel Structure
Usage:Car Parking Structure, Car Paking Shed
Certification:ISO
Customized:Customized
Width:60m
Length:100m
Height:12m
Column&Beam:Square Tube or H Beam
Purlin:C or Z Section Steel
Floor Deck:1.0mm Galvanzied Floor Deck
Export Markets:North America, South America, Eastern Europe, Africa, Mid East

Additional Info.

Trademark:HY
Packing:According to Clients′ Request
Origin:Shandong, China
Production Capacity:50000tons/Year

Product Description


1.Advantage of  steel parking structure:

a. High Strength, Long service Time:  service time is more than 50 years
b. Nice Appearance: can be designed into different shapes with less column
c. Easy to install: need  about 15 workers to finish installation in 20-50 days for most of steel building
d. Insulation: can use sandwich panel as wall and roof panel

                                                                                        Main Components:
Column H section steel, square tube
BeamH beam
PurlinC or Z purlin or rectangular pipe
Roof&Wall Panel0.5mm corrugated steel plate or sandwich panel(EPS, glasswool, rockwool, PU)
Doorroller or sliding door
Windowaluminium or PVC window
Other componentsroof skylight, roof ventilator, gutter, downpipe
Surface Treatmentpaint or hot-dip galvanizing
                                                                                          Installation:
Engineer:1 or 2 erection engineer
Worker15-25 workers for most of the projects
Main machinery1 or 2 sets truck crane
Time: 20-50 days after concrete foundation is finished
Send your message to this supplier
Avatar
Mr. Wang
Marketing Manager
*From:
To: Mr. Wang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category